东露天矿排土主要采用电铁排土工艺,其内排土场位于抚顺矿业集团西露天矿开采境界内,分别为东区排土场及西区排土场。2014年5月,西露天矿北帮出现片帮滑落,导致17-1、17-2、20段、24段四条排土线停止作业,造成东露天矿内排土场的排土能力突然大幅下降。 根据排土总量,提出内排土场规划建设方案,解决东露天矿排土压力过大的问题。The main electric iron dumping technology is used in the east open pit dump, and its inner dump site is located in the West surface o...全部
东露天矿排土主要采用电铁排土工艺,其内排土场位于抚顺矿业集团西露天矿开采境界内,分别为东区排土场及西区排土场。2014年5月,西露天矿北帮出现片帮滑落,导致17-1、17-2、20段、24段四条排土线停止作业,造成东露天矿内排土场的排土能力突然大幅下降。
根据排土总量,提出内排土场规划建设方案,解决东露天矿排土压力过大的问题。The main electric iron dumping technology is used in the east open pit dump, and its inner dump site is located in the West surface of the Fushun mining group。
。 May 2014, North West Open-pit Mine help spalling slipped, lead to 17-1 and 17-2, 20, 24 segments four row soil line to stop the operation, caused a sudden sharp decline in East open-pit dump dumping ability。
According to the total amount of soil, the plan of the internal dump is put forward, and the problem of the excessive pressure of the dump is solved。
。关键词:电铁排土场;新建排土线Key words: electric iron dump field; new row soil line。收起