急求机械轮船方面的中译英,达人进
stallation and operation
1。Based on situations, shipyard determines the position of swinging base and reinforces the deck installed with swinging base answering to requests。
2。In order to make sure the swinging base being installed appropriately, the residual of the part of deck jointing to the...全部
stallation and operation
1。Based on situations, shipyard determines the position of swinging base and reinforces the deck installed with swinging base answering to requests。
2。In order to make sure the swinging base being installed appropriately, the residual of the part of deck jointing to the swinging base will be removed acording to the slope of the deck。
3。The cable will be drawn out and connected well with the gewiss on the base。
4。After installation,open the remote button box and fetch the remote button to push the lift/drop button to check whether it is working normally。
5。 After unloading the crank handle,the electromotion should not work because of the switch effect。
6。 When the load is lifted,unload the gyration handle and turn it。
7。When power failure incurs, if the load will be unloaded, first fetch out the two bolts on the top of the motor(with thick gasket),get off the gasket,then reinstall the bolts to the former places(start the brake),unload the crank handle and the crank load。
After such operations,the gasketmust be reloaded(if not,there will be a slip when releasing the load,this has no effects on the use。
)
note:In order not to hurt yourself, you must not start the motor when operate manually, and you'd better to cut off the power of the control panel before you operate manually。
B。 Maintainance
1。 The lubricant in the lift must be replaced annually。
2、Each pulley should be infused with grease always
3。
when there is 10%(calculated in diameter) impairment on the wire rope or the wire rope is twisted,the rope to the backup ship must be replaced。
。收起