Members of the responsibility system for posts
1, to introduce the works of the plan, and do a good job procurement, transportation, storage,
Piling up work on the quality of the material should be strict (pre-certification, certification),
The failure of the organization never admitted。
2, the construction site of materials piling up, piling up in accordance with the construction of plane full lineup。
3, various types of material should be classified stockpiling working, neat formation, specifications Chengfang, to leave chaos。
4, to fulfill all the materials, quarter, annual accounting, inventory, to consumption, and so on,
Care for materials to best use, not wasted。
Powered by Google。